Tag Archives: TechWire Asia

New short term thinking

The news hit me somewhere yesterday. I got it by means of a LinkedIn mention, and it gave me reason to pause. Here is one version of that news (at https://techwireasia.com/2025/04/microsoft-pauses-key-builds-in-indonesia-us-and-uk-amid-infrastructure-review/) with the mention ‘Microsoft pauses data centre investment in Indonesia, US, and UK’, and here we see the byline “Microsoft pauses or delays data centre projects in the UK, US, and Indonesia.”, it is my view that they cannot afford this setting. You might have heard the American expression, “Go big or go home” and I think that Microsoft is about to go home. You see, I have forever had the clear opinion that there is no AI. I call it NIP (Near Intelligent Parsing), the setting that if too many start accepting the setting that I was always right (which comes from the clear setting that there is one AI station and it was given to us by Alan Turing) the people will realise that there is no AI and it comes down to programming and a programmer. That setting puts Microsoft in hot water for a lot of heavy water (to be poured over their heads). And lets be clear, a side you can confirm with mere logical thinking. A data Centre is a long term setting. No matter what you put in the White House (by some called the village idiot) whatever this administration is, it is short term and a data centre is long term and that so called hype around their AI should never waver. You see, this short term action (read: knee jerk reaction) implies short term planning and that is where they all get into hot waters. Why did you think that I made mention that Google needs to put a data centre in Iceland and consolidate their thinking into geo thermal reactors? (Reactors might not be the right word). A setting where ceramic tiles (or cylinders) surrounding new constructions that is not unlike a nuclear reactor, but the reactor is all around them, not Uranium rods, the Lava (or Magma) is the powerful and as it is merely bleeding the radiation, the fuel never dissipates and never ending energy is theirs. For all these parties looking of creating data centers (as far as I can see around 50 in total globally) they will all require energy and as one data centre takes energy close to a amount a small city does, we will get energy issues a lot sooner than we think.

Did Microsoft think this through? Pretty sure they did and their conclusion is that they cannot spend billion on data centers. So at the same time as we are given “Rivals Oracle and OpenAI ramp up investments”, I come to the conclusion that Microsoft can no longer afford the bills their ego’s committed themselves to. Feel free to disagree, but they set out this AI ‘vibe’ and own 49% of OpenAI, so why close down their Data Centers whilst they ‘own’ one of the ramp up partners? They are figuring out that they are too deeply committed. And as the world realizes that NIP is not the same as actual AI, they fear what is coming next.

So you decide what to make of the stage of “Microsoft has acknowledged changing its strategy but declined to provide details about specific projects. “We plan our data centre capacity needs years in advance to ensure we have sufficient infrastructure in the right places,” a Microsoft spokesperson said. “As AI demand continues to grow, and our data centre presence continues to expand, the changes we have made demonstrates the flexibility of our strategy.”” As I see it, it is an answer, but not the one that touches on this. I come with questions as ‘What growth?’ All this sets the need for some lowered activity, not pausing, unless you know what comes next and there is a larger setting with Oracle, Tencent and Huawei, I know there is a Swedish centre as well but I forgot the name. All these are ramping up, but Microsoft is pausing? That makes no sense unless there is another reason and my thought of “They can no longer afford it” takes another gander and when we consider that they paused “North Dakota, Illinois, Wisconsin, the UK midlands and Jakarta, Indonesia.” That implies something is going on and when we combine this with “Microsoft cuts data centre plans and hikes prices in push to make users carry AI costs” (source: The Conversation, March 3rd 2025) these elements together implies (imply, not proven) tells me that there is a funding setting for Microsoft. Combine that with the lovely voiced fact of “OpenAI brought in US$3.7 billion in revenue – but spent almost US$9 billion, for a net loss of around US$5 billion.” (Source: the Conversation) we see another failed setting and that failure gets to be bigger. As Amazon, Google, Oracle, Tencent and Huawei steam ahead getting larger data centers and ready long before Microsoft is there means less revenue for Microsoft. I did say that they could go big or go home? I reckon that Microsoft already lost 6 times on front settings and they lost to Amazon, Apple (twice), Sony, Adobe, Google, and IBM. I should add Huawei to that list but they already bungled that setting before Huawei became an actual competitor. A simple deduction from little stupid old me. 

So whatever you do, you might look into the trust you gave Microsoft and see that you are not left with an empty shell. Oh, and to prove that I am not anti-Microsoft you need to know that they did corner the spreadsheet market (Excel) and the flight Simulator market. Microsoft did some things good, but when it comes to the spin setting of vibes they need to reassess their situation.

Have a great day, it’s midweek now. I am happily in the next day.

Leave a comment

Filed under Finance, IT, Media, Science